7 Tukutata Crescent, Milldale


Scope of Work

This new residential build at 7 Tukutata Crescent, Milldale, required a robust foundation system focused on structural support and precise preparation for the home's cladding.

  • Structural Concrete Piles: Installation of a comprehensive piling system to ensure structural stability and reliable load transfer for the building.

  • Strip Footing: Construction of continuous, reinforced strip footings to support load-bearing walls and provide a durable perimeter for the structure.

  • Brick Veneer Preparation (Rebate): Specialized concrete detailing to create the required rebate, ensuring a seamless and weather-tight installation of the brick veneer cladding.

  • Concrete Laying: All associated concrete placing, levelling, and finishing for the foundation system and footings.

Next
Next

3 Tukutata Crescent, Milldale