25 Pekanga Road, Orewa
Scope of Work
This project in Orewa required a specialized foundation solution to create a split-level floor within the home's design. We executed a precision RibRaft foundation to meet the architectural requirements for the change in floor level.
Engineered RibRaft foundation
Integrated level change for a split-level floor
Structural footings and concrete pads
All associated concrete placing and finishing